Photovoltaic system installation for ATS

ATS Mechatronics is starting the installation of a photovoltaic system on its production site in Trasaghis (UD) Italy.


The traditionally energy-intensive steel industry is experiencing a transition to sustainability. The AIC Group is at the forefront of this, making a concrete commitment to circularity and eco-sustainability.

We have recently applied for Friuli Venezia Giulia regional funds to install a photovoltaic system at our ATS Mechatronics S.r.l. production site in Trasaghis (UD). The call is co-financed by the FESR and offers non-repayable grants to SMEs for the purpose of production and self-consumption of energy originating from renewable sources.

The project involves the installation of a photovoltaic system with a nominal capacity of 21.6 kWp to support an estimated annual electricity requirement of 23,286 kWh and a 20.48 kWh storage system.

The expected output of the extension is 23,376.67 kWh per year for an equivalent CO2 value of 9.46 tons CO2/year. 

The allowed expense amounts to €45,313.33, the granted contribution is €18,125.33 (of which FESR share €7,250.13).